Wanhua Energy Group Moves To A New Address


Deep Link
The office building of Wanhua Energy Technology Group is the first modular integrated building in Shandong Province. In 2019, it was rated as the “Shandong Province Prefabricated Building Demonstration Project”. Based on the plane layout and functional layout of the building, the project adopts the technical system of steel structure box modules in construction. It has the advantages of high integrated assembly rate and short on-site installation cycle, and uses unit modules as carriers to realize the assembly of the overall three-dimensional space.